LIST OF PROJECTS PERFORMED BY JSC PETROCHIM ENGINEERING
in the field of design and supply of equipment for oil refining,
petrochemical and chemical industries
|
Client |
Description of Work |
Year |
|||||
1. |
TECHNIP |
Design and supply of drums
and heat-exchangers (16 items) for Omsk Refinery |
1995 |
|||||
2. |
Saltsgitter Anlagenbau GmbH |
Design and supply of
columns, drums, heat-exchangers for Novokuybishev
Refinery |
1996 |
|||||
3. |
ООО
ELISTEK ENGINEERING |
Design and supply of Reactor R-1 and Regenerator R-2 for Omsk Refinery |
1997 |
|||||
4. |
OOO
PO KINEF |
Revamp of the vacuum unit, including vacuum generating system, for
AVT-6 at
OOO PO KINEF; supply of internals for Column K-10
and new steam ejectors |
1997 |
|||||
5. |
TEC |
Design and supply of equipment for the Catalytic Reforming and Isomerization Unit for Kuibyshevnefteorgsyntez |
1994-1997 |
|||||
6. |
ООО
ELISTEK ENGINEERING |
Design and supply of equipment (Columns К-203 and К-204, Scrubber)
for revamp of Deep Fuel Oil Processing Complex KT-1/1 for Mazeikiu
Nafta (Lithuania) |
1999 |
|||||
7. |
ООО ECT Service |
Revamp of heater feed coils of AVT-1 and AVT-2 units for Ryazan
Refinery |
1999 |
|||||
8. |
OOO
PO KINEF |
Detail engineering for revamp of the Sulpfur
Recovery Unit for OOO PO KINEF Design and supply of equipment (Catalytic Converter, Sulphur Catcher, Preheater
TP-1/2, Reactor-Generator RG-1, Sour Gas Separator E1) |
2000-2001 |
|||||
9 |
TAIF-NK |
Revamp of Heater
P-3 and transfer line of Vacuum Unit ELOU-AVT-7 for TAIF-NK Revamp of equipment (Columns K-201 and K-201, Sludge Settler C-201,
transfer line) for the FCC Unit, TAIF-NK |
2000 |
|||||
10. |
Ryazan Refinery |
Revamp of atmospheric Columns K-2 and K-5 for Units AVT-4 and AVT-6 of
Ryazan Refinery, Russia. Manufacture and supply of internals, supervision of
installation |
2001 |
|||||
11. |
OOO
PO KINEF |
Revamp of Heater F-101 for the OP-Xylenes
Unit, OOO PO KINEF, Russia |
2001 |
|||||
12. |
OAO Rosneft-Tuapse Refinery |
Design of Columns K-1 and K-2 for Unit AT-1 |
2001 |
|||||
13. |
OAO Rosneft-Tuapse Refinery |
Design of revamping Furnaces P-1 and P-2 for Unit AT-1 |
2001 |
|||||
14. |
OAO LINOS, Ukraine |
Design of revamping Column K-2 for Unit ELOU-AVT-8 and supply of
internals |
2002 |
|||||
15. |
OAO LINOS, Ukraine |
Designs of revamping Columns K-3 and K-8 for Unit ELOU-AVT-8 for OAO
LINOS |
2003 |
|||||
16. |
VNIPINEFT |
Designs of revamping Columns DA-0101, DA-0102, DA-0103 and DA-0150 for
the Visbreaking Unit of OOO Lukoil
Permnefteorgsintez |
2003 |
|||||
17. |
OAO Novokuibyshev Refinery |
Design of revamping Column К-1 for Unit AVT-9 and its delivery to Novokuibyshev
Refinery. |
2004 |
|||||
18. |
Marcon Ingenieurgesellschaft mbH |
Detail design for triple track CAV loading station (AUTN-2) to fill
oil derivates into tank-cars for TSB-2 of OAO Sibneft
– Omsk Refinery |
2004 |
|||||
19. |
Nizhnekamskneftekhim |
Design, supply and commissioning of Waste-Heat Exchanger KU-004 A/B |
2005 |
|||||
20. |
Sever-TEK |
Revamp of H2S Stripper C-2001 |
2005 |
|||||
21. |
Yutec Technologies Ltd. Israel |
Design, supply and commissioning of disk type regenerating
crystallizer for the Oil Dewaxing Unit of Orsknefteorgsyntez |
2005 |
|||||
22. |
ОАО
Angarsk Petrochemical Company |
Design basis specifications for developing detail engineering of light
cut fractionation from the reformate of Unit L-35/11-1000 |
2005 |
|||||
23. |
Yutec Technologies Ltd. Israel |
Design of disk type evaporating crystallizer for oil dewaxing units |
2006 |
|||||
24. |
ОАО
Angarsk Petrochemical Company |
Basic engineering for Isomerization Plant with
Feed Pre-Treatment Unit |
2006 |
|||||
25. |
Petrofac International Ltd. |
Design of LP and HP separators for oil field "Noviy
Urengoi" |
2006 |
|||||
26. |
ABB Lummus Global USA |
Design of revamping Reactor 01-R-106 for Ryazan Refinery |
2006 |
|||||
27. |
ОАО Angarsk Petrochemical Company |
Basic engineering of Isomerization Plant with Feed
Pre-Treatment Unit. Design of non-standardized
equipment (reactor, columns, evaporators, heaters) for the Isomerization Plant with Feed Pre-Treatment Unit |
2006 |
|||||
28. |
ОАО Angarsk Petrochemical Company Russia |
Basic engineering of revamping atmospheric and vacuum sections of Unit
GK-3 |
2006 |
|||||
29. |
ОАО Organicheskiy Syntez |
Design package for conical-to-spherical section joint for Reactors С-4001, С-4301, С-4601. |
2006 |
|||||
30. |
ZAO
LINIK, |
Detail engineering for Sulphur Recovery Unit,
Engineering design packages: WHRB firebox section, catalytic reactor,
pre-heater firebox, sulphur degassing column, sulphur separator |
2007 |
|||||
31. |
Mazeikiu Nafta |
Design calculations for vacuum Column К-601 |
2007 |
|||||
32. |
OAO Orsknefteorgsyntez |
Engineering design packages for Columns
К-1, К-2, К-3, К-4 for
Unit 22-4M |
2007 |
|||||
33. |
OAO
Krasnoleninsk Refinery |
Engineering
design package for crude topping Column Т-104 for Unit АТ. Engineering
design packages for Stripper Т-105, Absorber
T-106 for Unit АТ. |
2007 |
|||||
34. |
ZAO
ELISTEC ENGINEERING INTERNATIONAL |
Engineering design packages for
replacing air distributor in regenerator of FCC Unit G-43-107 for
OAO Moscow Refinery |
2007 |
|||||
35. |
OOO
Izhevsk Refinery |
Revamp of column K-1 for Unit AT. Manufacture and supply of trays. |
2007 |
|||||
36. |
ООО Narianmarneftegas |
Engineering
design package for gas filter, unit for hydrogen sulphide separation
from oil. Engineering
design package for oil filter, unit for hydrogen sulphide separation
from oil. Engineering
design package for column KO-25-1, unit for hydrogen sulphide separation
from oil. |
2007 |
|||||
37. |
OAO Orsknefteorgsyntez |
Engineering design package for welding nozzles to drums of Unit 22-4 |
2007 |
|||||
38. |
ZAO
LINIK, |
Engineering design package for separator drum E-201 for Vacuum Column K-10 vacuum system,
Unit ELOU-AVT-8 № 2 |
2007 |
|||||
39. |
Design of gas ducts and air ducts for atmospheric and vacuum heaters
of Unit ELOU-AVT |
2007 |
||||||
40. |
ОАО
Lukoil-Nizhegorodnefteorgsyntez |
Supply of disk type regenerating crystallizer for oil dewaxing unit |
2007 |
|||||
41. |
ООО Taneko |
Strength calculations of HP hydrocrackers under contract with Chevron |
2007 |
|||||
42. |
ООО Rosneft-Komsomolsk
Refinery |
Replacement of trays in Fractionator К-101 (DA-101) of the
Delayed Coker. Engineering design package.
|
2008 |
|||||
43. |
OAO Novokuibyshev Refinery |
Kettle-type Reboiler I-105 Heat & hydraulic calculation. Engineering design package for Column
K-101 for Isomerization Unit LSI-200 Detail design for i-Pentane Cut Recovery Unit |
2008 |
|||||
44. |
OAO Talvis |
Engineering design package for revamping Heat-Exchanger W-303 for Alcohol
Plant |
2008 |
|||||
45. |
ZAO
ELISTEC ENGINEERING INTERNATIONAL |
Engineering design packages of equilibrium catalyst unloading line
from the regenerator of Units GK-3/1 and 2 for AO UKRTATHAFTA |
2008 |
|||||
46. |
OAO Talvis |
Engineering design packages for revamping
Columns K-302, K-303 and K-304 |
2008 |
|||||
47. |
OAO Novokuibyshev Refinery |
Revamp of Column K-4 for ELOU-AVT Unit |
2008 |
|||||
48. |
ZAO Sibur-Chimprom |
Engineering design package of WHR Boiler KU-205 with steam drum |
2008 |
|||||
49. |
ZAO Dzerzhinskchimmash |
Design calculation of Coking Drum P-101A/B |
2008 |
|||||
50. |
ZAO Antipinsk
Refinery |
Engineering design package for Sump
Drum E-15 for ELOU-AT-2 Unit |
2008 |
|||||
51. |
ОАО
Moscow
Refinery |
Engineering design package for Reboiler T-3 for Hydrotreating Unit L-35-11/300 М |
2008 |
|||||
52. |
Sibur-Chimprom, Perm/TEC Korea Ltd. |
Engineering design package for Alkylation
Reactor R-1 Engineering design package for Transalkylation Reactor R-2 Engineering design package for Ethylene Adsorber K-31 Engineering design package for Benzene Adsorber K-50/1,2 |
2008 |
|||||
53. |
OAO Orsknefteorgsyntez |
Engineering design package. Stripper К-1 for the Isomerization Unit Engineering design package. Adsorber Dryer К-3/1,2 Engineering design package. Isomerate Stabilizing
Column |
2009 |
|||||
54. |
OAO Novokuibyshev Refinery |
Detail Engineering for
revamp of Unit ELOU-AVT-11 60-90 Cut Fractionating Unit
Revamp of Column К-4 for Unit ELOU-AVT-11 (revision). Manufacture and supply of trays. |
2009 |
|||||
55. |
ОАО
Novoufimsky Refinery |
Engineering design packages: Depropanizer Т-101, DeisobutanizerТ-101, Kettle-type Reboiler
Е-105, Kettle-type Reboiler Е-114/1,2, Kettle-type
Reboiler Е-118 for the Sulphuric
Acid Alkylation Unit |
2009 |
|||||
56. |
ОАО Angarsk Petrochemical Company |
Engineering
design packages. Hydrofinishing Reactor R-3 |
2009 |
|||||
57. |
ОАО Angarsk Petrochemical Company |
Engineering
design package. Heater F3 for the Hydrotreatment &
Isodewaxing Complex Engineering design package. Heater F2 for the Hydrotreatment
& Isodewaxing Complex |
2009 |
|||||
58. |
ОАО Novoil |
Engineering
design package. Scrubber Т-104 for the
Sulphuric Acid Alkylation Unit Engineering design package. Sulphuric Acid
Wash Coalescer for the Sulphuric Acid Alkylation
Unit |
2009 |
|||||
59. |
ZAO RNPK |
Engineering design package. Column К-4 for Unit ТК-1 |
2009 |
|||||
60. |
ОАО Kuibyshev Refinery |
Developing design for heater gas ducts and air ducts for Unit L-35/11-1000 |
2009 |
|||||
61. |
АО Bosansky Brod Refinery, Republika
Srpska |
Design basis
specifications. Detail design for the Reformate Fractionating Unit Engineering
design package. Column 04В-С1 for the Reformate Fractionating Unit Engineering design package. Cylindrical Fired Heater 04B-F1 |
2010 |
|||||
62. |
OAO Rosneft-Tuapse
Refinery |
Strength calculations of HP hydrocrackers under contract with Chevron |
2010 |
|||||
63. |
OOO
RN-Komsomolsk Refinery |
Engineering design packages for HP separators for Hydrocracking
Unit under contract with Chevron |
2010 |
|||||
64. |
OOO
RN-Komsomolsk Refinery |
Strength calculations of HP hydrocrackers under contract with Chevron |
2010 |
|||||
65. |
ОАО Rosneft – Achinsk Refinery |
Strength calculations of HP hydrocrackers under contract with Chevron |
2010 |
|||||
66. |
АО Bosansky Brod Refinery, Republic of Srpska |
Manufacture and supply of internals for Column 04B-C1 |
2010 |
|||||
67. |
GUP Petrochemical Process Institute |
Engineering design package for
Double-Section Catalytic Reactor R-1,2 |
2010 |
|||||
68. |
ОАО Salavatnefteorgsintez |
Design basis specifications for
fractionation section of Unit
L-35/11-1000 |
2010 |
|||||
69. |
ООО Novourengoy Gas-processing & Chemical Complex |
Strength calculations of Spherical
Storage Tank D-7301А/В for the Ethylene
Plant |
2010 |
|||||
70. |
OAO NK Rosneft
- Novokuibyshev Refinery |
Design basis specifications for
revamp of atmospheric section for Unit AVT-11 |
2010 |
|||||
71. |
ОАО
Khabarovsk
Refinery |
Engineering design package for Vacuum Column
C-1801 for Feed Treatment Unit for the Bitumen Plant |
2010 |
|||||
72. |
ОАО
Slavneft |
Engineering design package for replacing
coil of Heater P-2 for Unit АVТ-3 |
2010 |
|||||
73. |
ОАО
Moscow
Refinery |
Engineering design packages for Reactors R-101, R-202A/B and
Columns V-105, V-202, V-204 A/B, V-205A/B, V-211, V-215 for the Light Naphtha
Isomerization Unit |
2010 |
|||||
74. |
ОАО
NOVOIL |
Engineering design package for Stripper С-001 for Hydrogen Unit |
2010 |
|||||
75. |
ОАО
Kazanorgsintez |
Engineering design package for attaching the
distributor plate in Reactors С-4001, С-4301 and С-4601 for the Low
Density Polyethylene (LDPE) Unit |
2010 |
|||||
76. |
ОАО Rosneft – Achinsk Refinery |
Engineering design package for HP Separator V-3102/3202 for the
Hydrocracking Unit |
2010 |
|||||
77. |
АО Bosansky Brod Refinery, Republika Srpska |
Development of process operating manual for the Reformate Fractionation
Unit |
2010 |
|||||
78. |
АО Bosansky Brod Refinery, Republic of Srpska |
Designer's supervision for Reformate Fractionation Unit |
2011 |
|||||
79. |
OAO Rosneft
- Novokuibyshev Refinery |
Engineering design packages for HP Separators V-102, V-104,
V-106, V-301, V-302, V-304 for the Hydrocracking
Unit |
2011 |
|||||
80. |
ОАО
NOVOIL |
Engineering design package for Amine Absorber С-002 of the Hydrogen Unit |
2011 |
|||||
81. |
ОАО Ufaneftekhim |
Engineering design package for Reactor R-101С of the Hydrocracking Unit |
2011 |
|||||
82. |
ОАО Gazpromneftekhim Salavat |
Revamping Unit GO-4 of Section No 11 |
2011 |
|||||
83. |
Panchevo Refinery, Serbia |
Engineering design package for revamping
Reactor DC-2301 of the FCC Unit |
2011 |
|||||
84. |
ОАО Gazpromneftekhim Salavat |
Strength
calculations for Reactors R-1101, R-1102, Regenerator R-1103, Drum А-1101 of the FCC Unit |
2011 |
|||||
85. |
ОАО Kuibyshev Refinery |
Replacement of air pre-heaters for Unit L-35/11-1000 |
2011 |
|||||
86. |
ОАО Nizhnekamsk Refinery |
Engineering design package. Air duct bypass around air pre-heaters for Unit ELOU AVT-7. |
2011 |
|||||
87. |
ОАО Khabarovsk
Refinery |
Engineering design package for Vacuum Evaporator С-7503, Stripping Columns Т-3005, Т-3106/3206, Т-3107/3107,
Naphtha Stabilizing Column Т-3011 of the Visbreaking Unit |
2011 |
|||||
88. |
OAO Rosneft
- Novokuibyshev Refinery |
Engineering design package for Column К-2 of the Gasoline Stabilizing Unit |
2012 |
|||||
89. |
OAO Rosneft
- Novokuibyshev Refinery |
Manufacture and supply of
internals for Column К-2 of the
Gasoline Stabilizing Unit |
2012 |
|||||
90. |
ОАО Slavneft-YaNOS |
Engineering design package for replacing coil tubes for Heater P-1 of
Unit AVT-4 |
2012 |
|||||
91. |
ОАО
Khabarovsk
Refinery |
Engineering design packages for Columns С-7501, С-7502, С-7504, С-7505 and Absorber С-7506 for Feed Treatment Unit of the Bitumen Plant |
2012 |
|||||
92. |
OAO Orsknefteorgsyntez |
Engineering
design package for Reactor R-202 of Diesel Hydrotreatment
Unit LCh-24-2000 |
2012 |
|||||
93. |
OAO Rosneft
- Novokuibyshev Refinery |
Engineering design packages for Columns К-201 and К-202 of Parex Unit |
2012 |
|||||
94. |
OOO KINEF |
Check calculations (heat and hydraulic ones) for heaters P-101, P-102,
P-103, P-104 of Diesel and Gasoline Hydrotreating
Unit L-24/6 to define “bottlenecks” and reasons for coil fracture |
2012 |
|||||
95. |
OAO Dzerzhinskchimmash |
Process and hydraulic calculation of H2S Stripper V-1505 for Kharyaga Oil Fied operated by
TOTAL E&P RUSSIE |
2013 |
|||||
96. |
OAO Volgogradneftemash |
Complete strength calculation of Coke Drum for OAO Tatneft
with regard to wind, thermal and cyclic loads, and calculation of loads on
nozzles |
2013 |
|||||
97. |
OOO Proyect |
Engineering design packages for replacing internals in Columns K-4 and
K-7 of Oil Plant Unit 39/4 at OAO ANK Bashneft - Bashneft Novoil |
2013 |
|||||
98. |
ZAO SIB |
Engineering design packages for Columns T-301, T-401, T-402, T-405,
T-406, T-408, T-409, T-411, T-412, T-502, T-503, T-504, T-505, T-506, T-508,
T-507, T-801, T-901 for OAO Novokuibyshev Refinery |
2013 |
|||||
99. |
OAO ZAVKOM |
Strength calculations per ASME Code for the Polymerization Reactor with
regard to seismic effects |
2014 |
|||||
100. |
OAO Angarskneftekhimproyect |
Engineering design packages for non-standardized vessels (17 items) of
the HDPE Plant for OAO Angarsk Polymer Plant |
2014 |
|||||
101. |
OAO Salavatneftekhimproyect |
Engineering design packages for Reactors R-101, R-102 A/B, R-103 and Deaerator DA-101 of the Hydrogen Unit at OAO Gazprom Neftekhim Salavat |
2014 |
|||||
102. |
ОАО Angarsk Petrochemical
Company |
Engineering design packages for the transfer pipeline from Heater P-1/3
to Column K-13 of Unit GK-3 |
2014 |
|||||
103. |
ОАО Gazprom
Neftekhim Salavat |
Design basis specifications for PPF (propane-propylene fraction) Fractionator Unit at FCC Complex of ОАО Gazprom Neftekhim Salavat |
2014 |
|||||
104. |
OOO Elistek
Engineering |
Development of design documentation and provision of engineering
services for replacing Regenerator R-202 Section 200 of Complex KT-1/1 at OAO
Gazpromheft - Omsk Refinery |
2014 |
|||||
105. |
AO Dzerzhinskchimmash |
Thermal and hydraulic calculations of heat-exchangers E2501А/В,
E2502А/Е, E2503А/С, E2504А/D, E2505А/D, E2506А/В, E2510А/В, E2511А/В, E2512 |
2014 |
|||||
106. |
OOO Aliter-Axi |
Collecting initial data, examination of gas ducts, strength calculation
of gas ducts from the regenerator to external cyclone system and to pressure
reduction system of Unit G-43-107 at OAO Moscow Refinery |
2014 |
|||||
107. |
OAO Volgogradneftemash |
Coke Drum strength calculation (complete strength calculation with
regard to wind loads, calculation for thermal and cyclic load, calculation of
nozzle attachments with regard of loads on nozzles, calculation of loads on
foundation) Calculation of drum support hot box |
2015 |
|||||
108. |
OAO Volgogradneftemash |
Strength calculations of bottom hemispherical head to support skirt
connection area for the following items: |
2015 |
|||||
109. |
OOO Elistek
Engineering |
Strength calculation of revamped Reactor R-201 Section 200 Plant KT-1/1
of OAO Gazpromheft - Omsk Refinery |
2015 |
|||||
110. |
Suzhou THVOW Technology Co ,
China |
Design documentation for Regenerator R-202 of FCC Unit G-43-107M/1 at
OAO ANK Bashneft - Bashneft
Ufa Refinery |
2015 |
|||||
111. |
ZAO RNPK |
Re-calculation of coil for Heater P-602 of Unit LCh-35/11-60 |
2015 |
|||||
112. |
ОАО Gazprom
Neftekhim Salavat |
Engineering design packages for equipment (16 items) of PPF
(propane-propylene fraction) Fractionator Unit at
FCC Complex of ОАО Gazprom Neftekhim
Salavat |
2015 |
|||||
113. |
OAO TAIF-NK |
Check-calculation of waste heat boilers, gas ducts and stand-alone
stack for new operation conditions of heaters of Unit ELOU-AVT-7, Section No
1 |
2015 |
|||||
114. |
OAO TAIF-NK |
Engineering design package for repair of Heater VA-801 with change of
materials for coils and welded support parts and development of welding
procedure for coil support parts |
2015 |
|||||
115. |
OSP PI VNZM |
Engineering design packages for upgrading separators and columns (6
items) of the Delayed Coker Unit at OAO ANK Bashneft
- Bashneft UfaNeftekhim |
2015 |
|||||
116. |
ZAO NEFTEKHIMPROYEKT |
Strength calculations for bodies of Hydrotreating
Reactor R-101 and Dewaxing Reactor R-102 for AO Gazpromneft- Omsk Refinery |
2016 |
|||||
117. |
ООО ECT Service |
Check calculation of Heaters P-101, P-102, P-103, PT-201 to define the
possibility of their operation at Unit ELOU-AT-400t of OOO Foras (Syzran, Russia) |
2016 |
|||||
118. |
АО Angarsk Petrochemical
Company |
Examination of VDU of Unit GK-3 Section 11 at the Refinery (check
calculation of Heater P-1/3 and transfer pipeline from Heater P-1/3 to Column
K-13) |
2016 |
|||||
119. |
AO Uralkhimmash |
Engineering design packages for columns and drums (9 items) for OOO “Ust-Kut Gas Processing Plant”, based on Data Sheets
provided by UOP RUSSELL, LLC. |
2017 |
|||||
120. |
AO Giprovostokneft |
Strength calculations of hot oil expansion drums E-4402 and E-4403 |
2017 |
|||||
121. |
OOO Promkhimproyect |
Engineering design packages for fuel gas KO drums and preheaters (5 items) for OAO Slavneft-YaNOS |
2017 |
|||||
122. |
AO Construction Company
PROFILE |
Examination of damaged underground storage tanks (8 items) at OAO NPO
Saturn, engineering design packages for restoring their operability |
2017 |
|||||
123. |
AO RANZHEM |
Design of heater coil for feed water and fuel Item 107/30 for AO FosAgro-Cherepovets |
2017 |
|||||
124. |
AO RNPK |
Strength calculation for Column (Stabilizer) K-4 of Unit AVT-3 |
2017 |
|||||
125. |
OAO ZAVKOM |
Strength calculations per ASME for the Concentration with Agitator with
regard to seismic effects |
2018 |
|||||
126. |
OOO KINEF |
Engineering design package for Sampling Cooler UOP No 16 |
2018 |
|||||
127. |
JK Inspection Engineering
Co., Ltd., Korea |
GOST Strength Calculations for columns 81-VC-101, 81-VC-102, 81-VC-103,
81-VC-107 |
2018 |
|||||
128. |
OAO Volgogradneftemash |
Engineering design packages for Column K-5 and Absorbers K-4 and K-5
for OOO NAFTAN, Republic of Belarus |
2019 |
|||||
129. |
AO RANZHEM |
Replacement of radiant coil and supply piping arrangement for Flue Gas
Heater PVG-1200 at KAO Azot |
2019 |
|||||
130. |
JK Inspection Engineering
Co., Ltd., Korea |
GOST strength
calculations for vessels: - Air/Tail Gas
Interchanger E1413 |
2019 |
|||||
131. |
OAO Volgogradneftemash |
Strength calculation of Coke Drums R-102 1/2 for Delayed Coking Unit at
AO Gazpromneft - Moscow Refinery |
2019 |
|||||
132. |
OOO Polinom |
Engineering design package: Replacement of pipeline 201/1 “Cracking
product vapors from Reactor R-201 to Motorized valves HE 2-1 2-10” at AO Gazpromneft - Moscow Refinery |
2019 |
|||||
133. |
OOO Proyektstroymontazh |
Strength calculation of Fuel Gas Heater |
2019 |
|||||
134. |
AO ZAVKOM |
Strength calculation of catalytic reactor with internal heat-exchanger |
2019 |
|||||
135. |
AO ZAVKOM |
Strength calculation of cold intermediate heat-exchanger |
2019 |
|||||
136. |
OOO Bashgiproneftekhim |
Engineering design packages for Coke Drums of Decayed Coker Unit at PAO
ANK Bashneft - Bashneft UfaNeftekhim |
2020 |
|||||
137. |
OOO Bashgiproneftekhim |
Engineering design packages for Reactor Unit Coke Drums R-1÷4
for Unit 21-10/3M Section 17, 19 at NPP AO Angarsk Petrochemical Company |
2020 |
|||||
138. |
OOO Bashgiproneftekhim |
Engineering design packages for Coke Drums R-301/1,2 of Decayed Coker
Unit 21-10/5К at AO Novokuibyshev Refinery |
2020 |
|||||
139. |
OOO Bashgiproneftekhim |
Engineering design packages for Coke Drums R-1÷4 for Unit
21-10/700 at PAO ANK Bashneft - Bashneft
Novoil |
2020 |
|||||
140. |
OOO KINEF |
Engineering design package. Adsorber
К-101/1,2,3 for Units Parex-1,2 Section No 9 |
2020 |
|||||
141. |
OOO KINEF |
Engineering design package. Heat-exchangers T-106, T-107 |
2020 |
|||||
142. |
OOO Zavod
Spetspischemash |
Strength calculation of water storage tank V=500 m3 |
2020 |
|||||
143. |
OAO Volgogradneftemash |
Strength calculation of flanges for multicyclone
filters 500-СС-001 А/В/С per EN 13445.3-2014 |
2020 |
|||||
144. |
OAO Volgogradneftemash |
Strength calculation of hot box for HP Hot Separator 4104D0102 |
2020 |
|||||
145. |
PC ORLEN Lietuva |
Strength calculations and temporary design configurations to ensure
safe operation Regenerator R-020 of Unit G-43-107M at Mazeikiai
Refinery |
2021 |
|||||
146. |
OOO NIPI NG Peton |
Engineering design packages for Coke Drums 1000-R-1÷4 for
Delayed Coked Unit at AO Novoshakhtinsk Petroleum
Product Plant |
2021 |