1. |
Bashgiproneftechim |
Equipment for Reforming and
Hydrotreating Units |
TECHNIP France |
1994 |
2. |
Surgutgasprom |
Equipment for crude processing
unit |
Petrofac USA |
1994 |
3. |
Kirishinefteorgsyntez |
Equipment for LABS Unit |
Grigo Romania |
1994 |
4. |
ARCON |
Equipment for Condensate Stabilization and Debutanization Unit for Yamburgsky
Gas Field |
T.H. Russel Company USA |
1995 |
5. |
PKB Plastmash |
Equipment for Luginetsky and
Harampursky Compressor Stations. |
Bateman RSA |
1995 |
6. |
Lurgi, |
Equipment for crude processing
unit for Yuganskneftegas |
Lurgi Germany |
1995 |
7. |
Kirishinefteorgsyntez |
Fired heaters for AVT-6 Unit |
KTI Italy |
1995 |
8. |
Aurat |
Reactors R-201
and R-202, centrifugal pumps |
Eisenund huttenwerke thale AG Germany
Germany |
1996 |
9. |
Kuybishevnefteorgsyntez |
Modular catalytic reforming and isomerization unit |
TEC Japan |
1996 |
10. |
SKL Comprimo Germany |
Heater Р-101 for Ukhta Refinery |
SKL Comprimo |
1996 |
11. |
Lampart |
Enameled equipment |
Lampart |
1996 |
12. |
SKL Comprimo |
Heater for Unit AT-2 for Khabarovsk Refinery |
SKL Comprimo |
1997 |
13. |
SKL Comprimo |
Superclauss Unit for Yaroslavnefteorgsyntez |
SKL Comprimo |
1997 |
14 |
Bateman |
5 MW Boiler for Tomskneft |
Bateman |
1997 |
15. |
Paralloy |
Centrifugal cast pipes and products |
Paralloy |
1997 |
16. |
KTI Spa |
Natural gas sweetening plant for Korobkovsky GPP |
KTI Spa |
1998 |
17. |
Bateman Pipeline Services Ltd |
Pipeline inner coatings and coat application equipment |
Bateman Pipeline Services Ltd |
1998 |
18. |
Packinox |
Plate-type heat exchangers |
Packinox |
2000 |
19. |
Howden Process Compessors |
Complete packaged compressor station for Korobkovsky OGPU |
Howden Process Compessors |
2000 |
20. |
Paralloy |
Centrifugally cast pipes and products |
Paralloy |
2000 |
21. |
BHS Corrugated Maschinen und
Anlagenbau GmbH |
Corrugated board production line Type WPA |
BHS Corrugated Maschinen und
Anlagenbau GmbH |
2000 |
22. |
Schmidt+Clemens GmbH+ Co. |
Centrifugally cast pipes and products |
Schmidt+Clemens GmbH+ Co. |
2000 |
23. |
Solar Turbines International
Co. |
Complete packaged gas-turbine power units (10 MW and 15 MW) for Slavneft-Megionneftegas |
Solar Turbines International
Co. |
2000 |
24. |
DKG East |
Equipment for Oil & Gas industries |
DKG East |
2000 |
25. |
York Refrigeration ApS |
Refrigeration equipment for ammonia-based
refrigerating units |
York Refrigeration ApS |
2000 |
26. |
Ventech Engineers Inc. |
Oil Reforming & Hydrotreating Unit GKR-126/33 for LUKoil Western
Siberia |
Ventech Engineers Inc. |
2001 |
27. |
SGS GTS Inc. |
Liquid chillers with rotary compressors & service pumps |
Ellis & Watts Inc. |
2001 |
28. |
Tecnicas Reunidas S.A. |
Heaters P-1, P-2, P-3 & P-4 for Hydrotreating Unit L-24/5, Moscow
Refinery |
Tecnicas Reunidas S.A. |
2001 |
29. |
HMD Seal/Less Pumps Ltd. |
Centrifugal sealless magnetically driven pump units Series GTA-GTI,
GSA-GSI, GSP, SPGSA-SPGSI, HPGSA-HPGSI, ALA, CS GSS, HD, and centrifugal
sealless pumps MagMax |
HMD Seal/Less Pumps Ltd. |
2001 |
30. |
Mitsubishi Heavy Industries
Ltd. |
Centrifugal compressors Types
5V, 6V и 7V with ancillary equipment and spares for
explosion-hazardous facilities |
Mitsubishi Heavy Industries
Ltd. |
2001 |
31. |
Tapco International Inc. |
Refractory coated slide valves
with electro-hydraulic actuators and power control systems for catalyst lines
of catalytic cracking unit for Ufaneftekhim |
Tapco International Inc. |
2001 |
32. |
Interinvestproject |
Crude
topping units 41-PK-L510, 25-PK-E001, 24-PK-E001 for Novorossiysk maritime
terminal, Kropotkin and Komsomolskaya Pump Stations within pipeline system of
Caspian Pipeline Consortium |
Petrofac |
2001 |
33. |
SGS GTS Inc. |
Retrievable double grip packers
Model ETI-AS II for oil and gas facilities |
D&L Oil Tools |
2002 |
34. |
OAO Kurganchimmash Russia |
Equipment for construction,
repair and maintenance of trunk oil-, product- and gas-lines |
OAO Kurganchimmash Russia |
2002 |
35. |
Marcon Ingenieurgesellschaft mbH |
Automated double track CAV
loading station to fill clear oil-derivates into tank-cars with gasoline
vapor recovery unit for Ufaneftekhim |
Marcon Ingenieurgesellschaft mbH |
2002 |
36. |
SGS GTS Inc. |
50000 t/yr Polystyrene Plant
for OAO Nizhnekamskneftekhim |
Belleview Engineering &
Construction |
2002 |
37. |
Flowserve B.V. Netherlands |
Single and double mechanical
seals and dry gas sealing systems for shafts of pumps, compressors, turbines,
centrifuges, agitators and mixers with spares and instruments for seal
performance monitoring. |
Flowserve B.V. Netherlands |
2002 |
38. |
ZAO MR-ENERGO-STROY Russia |
Gas-turbine power station
EG-2500-M1 with water heating boiler KUV-5,3 for oil and gas facilities |
OAO Joint-Stock Company YUZHTRANSENERGO |
2002 |
39. |
ZAO NPCEO Russia |
Injection and blast gas/liquid
burners with steam atomizing for fired heaters |
ZAO NPCEO Russia |
2002 |
40. |
Marcon Ingenieurgesellschaft mbH |
Automated double track CAV
loading station to fill aromatic, clear and dark oil-derivates into tank-cars
with gasoline vapor recovery unit for OAO Sibneft-Omsk Refinery |
Marcon Ingenieurgesellschaft mbH |
2002 |
41. |
Marcon Ingenieurgesellschaft mbH |
Automated triple track CAV
loading station to fill clear oil-derivates into tank-cars with gasoline
vapor recovery unit for OAO Sibneft-Omsk Refinery |
Marcon Ingenieurgesellschaft mbH |
2002 |
42. |
ZAO MR-ENERGO-STROY Russia |
Gas-turbine power station
EG-6000-T with water heating boiler KUV-8,9 |
OAO Joint-Stock Company YUZHTRANSENERGO |
2003 |
43. |
Linde BOC Process Plants LLC |
Welded vessels and units, air
coolers and process pipelines incorporated into 100 MMCFT/D Liquefied Hydrocarbon
Gas Recovery Plant for Severo-Gubkinsky Oil Field. |
Linde BOC Process Plants LLC |
2003 |
44. |
OAO Tatneft Bugulminsky Mechanical Works Russia |
Equipment for Oil and Gas industries |
OAO Tatneft Bugulminsky Mechanical Works Russia |
2003 |
45. |
SGS GTS Inc. |
12 fuel gas compressor units
for OAO Surgutneftegas |
Toromont Process Systems |
2003 |
46. |
ZAO MR-ENERGO-STROY Russia |
10 MW Gas-Turbine Power Station
for Zapadno-Poludennsky oil-and-gas field for NGD"Strezhevoyne",
OAO Tomskneft VNK |
OAO Joint-Stock Company YUZHTRANSENERGO |
2003 |
47. |
AO Korimos Russia |
Reactors R-100/1 and R-100/2 |
AO Korimos Russia |
2003 |
48. |
ALFA Contracting GmbH |
Refrigeration Compressor Units
Type N 250-MB (1 ea) and Type N 200VM-ME (1 ea) |
ALFA Contracting GmbH |
2003 |
49. |
Hermetic-Pumpen Germany |
Sealless centrifugal pumps
Series CN – Types (P); (P)F; (P)K and Series CAM(K); magnetically-driven glandless
centrifugal pump units Series M – Types CN(B); CNF(B); CNK and CAM(B) |
Hermetic-Pumpen Germany |
2003 |
50. |
SGS GTS Inc. |
Railroad car blasting and
painting facilities for St.-Petersburg Car Depot, "Moscow-3" Car
Depo and Moscow Car Repair Works |
U.S. Filter / Wheelabrator Canada Inc. |
2003 |
51. |
BHS Corrugated Maschinen und Anlagenbau GmbH, Germany |
Corrugated
board production line Type WPA |
BHS Corrugated Maschinen und Anlagenbau GmbH, Germany |
2003 |
52. |
S.A. PACKINOX France |
Plate-type
heat-exchangers with spare parts |
S.A. PACKINOX France |
2003 |
53. |
Schmidt+Clemens +GmbH+Co.KG Germany |
Heater components for refineries and petrochemical plants |
Schmidt+Clemens +GmbH+Co.KG Germany |
2003 |
54. |
KURGANCHIMMASH Russia |
KURGANCHIMMASH Russia |
2003 |
|
55. |
Envig-Bronswerk spol s.r.o Czech Republic |
Air-coolers with heat-exchange area up to |
Envig-Bronswerk spol s.r.o Czech Republic |
2003 |
56 |
AKZO NOBEL UK |
Equipment for
Organic Peroxides Plant |
AKZO NOBEL UK |
2003 |
57. |
SGS N.A. |
Pulp egg box
production line Model RP4200l671/2-1НР-1Р with incorporated
economizer, pressure vessels, burners and spare parts |
Emery
International Developments Limited Canada |
2004 |
58. |
York Refrigeration ApS |
Refrigerating
equipment |
York Refrigeration ApS |
2004 |
59. |
DKG East |
Equipment for
plants and facilities of oil, gas, chemical and petrochemical industries |
DKG East |
2004 |
60. |
Doncasters Paralloy |
Heater
components for refineries and petrochemical plants |
Doncasters Paralloy |
2004 |
61. |
Elistec Engineering
International |
One-through
reactor of Catalytic Cracking Unit G-43-107 for OAO Moscow Refinery |
Elistec Engineering International |
2004 |
62. |
FEROX a.s |
Vessels for
storing cryogenic liquids and evaporators for cryogenic liquids for potentially
hazardous production plants (facilities). |
FEROX a.s |
2004 |
63. |
SGS N.A. |
4500 t/d Visbreaking Plant for
OAO Slavneft-Yaroslavnefteorgsyntez |
TEC |
2004 |
64. |
SGS N.A. |
Equipment and
technical devices for Vacuum Gas Oil Hydrotreating Complex, including VGO
Hydrotreating Unit, Hydrogen Unit, Amine Regeneration Section, Sour Water
Stripping Unit, Sulphuric Acid Alkylation Unit and Utility Section for OAO
Ryazan NPK |
ABB Lummus Global, Inc. |
2004 |
65. |
OAO Machine-Building Plant ZiO-Podolsk Russia |
Shell-and-tube
heat-exchangers and exchanger tube bundles for chemical, petrochemical and
refining industries |
OAO Machine-Building Plant ZiO-Podolsk Russia |
2004 |
66. |
Rostechexpertiza Association |
Pumping units UN-320x70
(BDN-70) – models PTS36, PTS36C, PTS36E and their components for oil and gas
production plants and facilities |
Petroleum Equipment Manufacturing Plant |
2004 |
67. |
SGS N.A. |
50000 t/yr General Purpose
Polystyrene Plant, for OOO Penoplex-Kirishi (Kirishi, Russia) |
TEC |
2004 |
68. |
HEROSE GmbH Germany |
Industrial valves for chemical,
petrochemical and refining plants as well as for potentially hazardous plants
(facilities) subject to jurisdiction of RF Federal Authority for
Technological Supervision |
HEROSE GmbH Germany |
2004 |
69. |
Marcon Ingenieurgesellschaft mbH |
Automated double track CAV loading station to fill
stabilized gas condensate into tank-cars for ZAO ROSPAN International (Noviy
Urengoi) |
Marcon Ingenieurgesellschaft mbH |
2004 |
70. |
Mitsubishi Heavy Industries Ltd. Japan |
Centrifugal compressors type 5V, 6V & 7V with
accessories & spares |
Mitsubishi Heavy Industries Ltd. Japan |
2004 |
71. |
Bronswerk Heat Transfer spol. s r.o Czech Republic |
Air-coolers with heat-transfer
area of up to 100000 m2 and design pressure of up to 32 MPa (320
bar), and heat-exchangers with heat-transfer area of up to 1000 m2
and design pressure of up to 10 MPa (100 bar) with components and spares for
plants and facilities in the Russian Federation. |
Bronswerk Heat Transfer spol. s r.o Czech Republic |
2005 |
72. |
The Japan Steel Works, Ltd. Japan |
Reactors for the Hydrocracking Unit for OOO PO
Kirishinefteorgsyntez |
The Japan Steel Works, Ltd. Japan |
2005 |
73. |
RUSTEK SA Switzerland |
Equipment and technical devices
incorporated into HC vapor recovery unit for Rosneft - Bryansk Refinery |
Cool Sorption A/S Denmark |
2005 |
74. |
OOO Research & Production
Firm KONTEKH-KRIO |
Pumps and pumping units for cryogenic
liquids |
OOO Research & Production
Firm KONTEKH-KRIO |
2005 |
75. |
Emerson Process Management, Daniel
Measurement and Control Division |
Crude custody transfer systems
for KP-72 and gas custody transfer systems (Botasyno) for Sakhalin I Project |
Emerson Process Management,
Daniel Measurement and Control Division |
2005 |
76. |
SGS N.A. |
Hydrocracking Plant of |
TEC |
2005 |
77. |
SGS N.A. |
Power supply systems for Sakhalin I Project |
Northern Power System, Inc. |
2005 |
78. |
Velosi |
Single Point Mooring Terminal |
Bluewater Energy Services B.V. |
2005 |
79. |
RUSTEK SA Switzerland |
Compressor Unit for OAO Slavneft Yaroslavnefteorgsyntez |
Siemens AG PGI |
2005 |
80. |
Rostechexpertiza Association |
Detail Design Documentation Packages for process
plants: - combined sulphuric acid alkylation plant with
n-butanes isomerization unit; - combined sulphuric acid production and recovery unit; - combined VGO hydrotreating and hydrogen production unit; - VGO complex waste disposal and processing unit. |
OAO VNIPINEFT Russia |
2005 |
81. |
VA TECH ELIN EBG |
Automated double track CAV loading station to fill
crude for OOO Russneft-Bryansk (Russia) |
VA TECH ELIN EBG |
2005 |
82. |
SGS N.A. |
Fuel gas compressor station for
Chepetsk Mechanical Works |
Toromont Process Systems Canada |
2005 |
83. |
OOO Tekhnoneftegas Russia |
Turbine-generator units Taurus
60 & Centaur 50L for OAO LUKOil (Russia) |
Solar Turbines Inc. USA |
2005 |
84. |
OOO NGDU Oktyabrskneft Russia |
Unit GFU-600 for GPP OOO NGDU
Oktyabrskneft |
OOO NGDU Oktyabrskneft Russia |
2005 |
85. |
Rostechexpertiza Association |
Engineering documentation of Investment
Feasibility Study Phase for construction of refining and petrochemical
complex |
ZAO Nizhnekamsk Refinery Russia |
2006 |
86. |
Rostechexpertiza Association |
Engineering documentation of Investment
Feasibility Study Phase for construction of crude pipeline from NPS Kaleykino
to Nizhnekamsk Refinery |
ZAO Nizhnekamsk Refinery Russia |
2006 |
87. |
Rostechexpertiza Association |
Engineering documentation of Feasibility
Study Phase for construction of export pipeline from the refining and
petrochemical complex at Nizhnekamsk (Tatarstan), developed by OAO Institute
Nefteproductproject |
ZAO Nizhnekamsk Refinery Russia |
2006 |
88. |
TEC |
Reforming Unit for OAO Slavneft
Yaroslavnefteorgsyntez |
TEC |
2006 |
89 |
Rostechexpertiza Association |
Detail design packages for Combined VGO Hydrotreating & Hydrogen
Production Unit, Combined Sulphuric Acid Alkylation Unit with n-Butane
Isomerization Unit, Combined Sulphuric Acid Production & Regeneration
Unit, VGO Hydrotreating Complex Alkylation Unit Intermediate Tank Farm,
developed by OAO VNIPIneft |
ZAO Ryazan Refining Company |
2006 |
90 |
SGS NA USA |
Crude Quantity & Quality
Measurement Systems (SIKN), Gas Quantity Measuring Complex and Leak Detection
Systems for Sakhalin I Project |
Emerson Process Management / Daniel Measurement and
Control Division (USA) |
2006 |
91 |
SGS NA USA |
Sheltered engine-based
generator sets supplied to Sakhalin Energy Investment Company Ltd. (Sakhalin
II Project) for electricity generation at BS2 and Chayvo Sites |
Northern Power System Inc. (USA) |
2006 |
92 |
ZAO CTK-EURO |
Refractory-lined slide valves
with electric/hydraulic power unit and control system, and refractory-lined
butterfly valve for OAO Ufaneftekhim (Russia) |
TAPCO International, Inc. (USA) |
2006 |
93 |
Schoeller-Bleckman Nooter apparatetechnik GmbH (Austria) |
HE series heat exchangers, WHB
series waste heat boilers and pressure vessels (UR series urea reactors and
AC series ammonia converters) |
Schoeller-Bleckman Nooter apparatetechnik GmbH (Austria) |
2006 |
94 |
OOO Air Liquide |
Complete PSA unit M200 for
oxygen production |
Air Liquide |
2006 |
95 |
OAO Kurganchimmash |
Oil and gas equipment, columns
and column units, filters and filter units, drums and drum units, vessels
with agitators, electric dehydrators, electric separators (electric
coalescers) |
OAO Kurganchimmash |
2007 |
96 |
OAO N.S. Artemov Tambov Factory
Komsomolets |
Steel tanks and drums for
storage of explosion- and fire-hazardous chemical and petrochemical products,
filters and gas treatment units |
OAO N.S. Artemov Tambov Factory
Komsomolets |
2007 |
97 |
SGS Vostok |
Visbreaker Heaters P-1 and P-1A
for the Hydrocracking Complex at OAO LUKOIL-NIZHEGORODNEFTEORGSYNTEZ |
Foster Wheeler Iberia |
2007 |
98 |
SGS NA USA |
Gas generators and gas turbines LM2500... with auxiliary equipment and
spares |
GE Aero Energy, a General
Electric Company Business (USA) |
2007 |
99 |
ZAO IMS Engineering |
Crude and oil heating and
unloading unit, type URSN |
ZAO IMS Engineering |
2007 |
100 |
SGS NA USA |
Wellhead equipment with casing
heads and mounting hardware |
Wood Group Pressure Control Canada, Inc. (Canada) |
2007 |
101 |
TEC |
Basic Design Package for 50000
t/yr General Polystyrene Plant for OOO PENOPLEX-Stroy, Kirishi |
TEC |
2007 |
102 |
Rolls-Royce Marine AS |
Gas motor-generators type:
B35:40 V12AG, B35:40 V16AG, B35:40 V20AG, KVGS-12G4.2, KVGS-16G4.2,
KVGS-18G4.2 |
Rolls-Royce Marine AS |
2007 |
103 |
HEURTEY PETROCHEM S.A. |
Vacuum Heaters H-1001A/B and
Visbreaker Heater H-3001 for the Hydrocracking Complex, OOO PO Kirishinefteorgsyntez |
HEURTEY PETROCHEM S.A. |
2007 |
104 |
OAO Giprogazoochistka |
Design documentation for 5x22
t/hr steam boiler facility to supply steam to gas sweetening unit at Yuzhnaya
Khylchuyu CPF |
OAO Giprogazoochistka |
2008 |
105 |
OAO Salavatneftemash |
Bellows-type expansion joints,
access holes PN-T for pipelines |
OAO Salavatneftemash |
2008 |
106 |
ZAO Petrozavodskmash |
Columns |
ZAO Petrozavodskmash |
2008 |
107 |
OOO NPK OilGazMash |
Natural gas air coolers type
AVG-85MG, welded coils for fired heaters |
OOO NPK OilGazMash |
2008 |
108 |
Rostechexpertiza Association |
HC Feed Fractionation Unit, Eng Spec
3611-001-57078173-2007 |
ZAO NPK Tekhno-TEK |
2008 |
109 |
ZAO Techneftekhim |
Ethane
Pyrolizers, 32 T/hr capacity in terms of feedstock, to be part of EP-300 Unit
at Monomer Plant, OAO Salavatnefteorgsyntez |
ZAO Techneftekhim |
2008 |
110 |
RUSTEK SA |
Complete
Formaldehyde Plant for OOO Karbodin |
Perstorp
Specialty Chemicals AB |
2008 |
111 |
SGS NA |
DuPont
STRATCO complete contactor reactors and acid settlers for Sulfuric Acid
Alkylation Unit, ZAO Nizhnekamsk Refinery |
DuPontTM
STRATCO® Clean Fuel Technology |
2008 |
112 |
Witt & Sohn AG |
Industrial
centrifugal fans Series R-..., L-..., P-..., M-..., H-..., S-... and axial
fans Series N-..., NR-..., M-..., MR-..., X-..., Y-... |
Witt
& Sohn AG |
2008 |
113 |
ОАО
Novokuibyshev Refinery |
Extension
of overhaul cycle for Unit AVT-11 |
ОАО
Novokuibyshev Refinery |
2008 |
114 |
ZAO Johnsons
Controls |
Ammonia
condensation facility and ammonia refrigerating unit for ОАО
Minudobreniya |
ZAO Johnsons
Controls |
2008 |
115 |
Alfa
Laval Packinox |
Plate-type
heat exchangers |
Alfa
Laval Packinox |
2008 |
116 |
HEURTEY
PETROCHEM |
Heaters
3-Н2001
and 3-Н2002
for Vacuum Gasoil Hydrotreating Unit, OAO Lukoil Nizhegorodnefteorgsyntez |
HEURTEY
PETROCHEM |
2008 |
117 |
TEC |
Equipment for 50 kT\yr General Purpose Polystyrene
Plant, ООО PENOPLEX-Stroy, Kirishi |
TEC |
2008 |
118 |
SGS NA |
Sulphur Granulation Unit with storage and loading
facilities for ОАО Astrakhangazprom |
ENERSUL LIMITED PARTNERSHIP |
2008 |
119 |
Samsung Techwin Co., Ltd. |
Air turbo compressors Type TM/SM |
Samsung Techwin Co., Ltd. |
2009 |
120 |
SGS NA |
Condensation Units for ОАО Lukoil Nizhegorodnefteorgsyntez |
Graham Manufacturing |
2009 |
121 |
RUSTEK SA |
Vertical shell-and-tube evaporators Type BHM and
heat-exchangers Type A, B, C, D, E, F, G, H, J, K, L, M, N, P, S |
BROWN Fintube France S.A. |
2009 |
122 |
SGS NA |
LP and SSP Packages for PET Unit (6400) for ZAO
Nizhnekamsk Refinery |
Chemtex
International, Inc. |
2009 |
123 |
RUSTEK SA |
Air Collers Type BKU-1, BKU-2, NEG H Z 700, NEG H Z
800, NEG H Z 900, NEG H Z 1000 |
GEA NEMA Waermetauseher GmbH |
2009 |
124 |
SGS NA |
Generators with turbine drive Taurus 60 and
gas-turbine unit with gear drive MARS100 for Exxon Neftegas Limited, Russia |
Solar Turbines Incorporated |
2009 |
125 |
ОАО Moscow Refinery |
Detail engineering package No 45-08-1345
"Conversion of Railroad Unloadibg Rack (Unit 1345) to Unloading-Loading
One and Making it Conform to Applicable Regulatory Requirements" |
ОАО Moscow Refinery |
2009 |
126 |
SILEA S.p.A. |
Unloading-loading systems |
SILEA S.p.A. |
2009 |
127 |
ZAO NTK Modulneftegaskomplekt |
Flare units |
ZAO NTK Modulneftegaskomplekt |
2009 |
128 |
Sojitz Corporation |
Steam_Turbine Generator Units Type B and C |
Shin Nippon Machinery Co., Ltd. |
2009 |
129 |
ZAO CTK-EURO |
Axial expansion joint FCC/UMA/PT DN 1500/1650 SN
08-0943-P35214-01 for ОАО Ufaneftekhim |
Idrosapiens S.r.l. |
2009 |
130 |
ОАО
Novokuibyshev Refinery |
Evaluate
possible extension of overhaul cycle (2 years) and develop recommendations to
ensure safe operation of Unit АVТ-11 |
|
2009 |
131 |
OOO KINEF |
Evaluate
possible extension of overhaul cycle (4 years) and develop recommendations to
ensure safe operation of Units: AT-1, AT-6, AVT-2, AVT-6, ELOU-2, 19/6,
19/10, L-35-11/300, L-35-11/600 |
|
2009 |
132 |
OAO Slavneft-YaNOS |
Technical examination
(including use of acoustic emission method) and industrial safety expert
review, technical inspection |
|
2009 |
133 |
OOO PO Kirishinefteorgsyntez |
Technical examination and
industrial safety expert review, technical inspection |
|
2009 |
134 |
SGS NA |
Wellhead components |
Weatherford
Wellhead Systems |
2010 |
135 |
RUSTEK SA |
Gas and air dryers Type SDB |
Samsung Techwin Co., Ltd. |
2010 |
136 |
RUSTEK SA |
Butterfly valves Models GTD, FSD, MTD, GFB, GLB,
GRS, TOD |
KOREA UNICOM VALVE CO., LTD |
2010 |
137 |
SGS NA |
Valves
and pumping equipment |
Kimray, Inc. |
2010 |
138 |
ОАО
Novokuibyshev Refinery |
Evaluate
possible extension of overhaul cycle (2 years) and develop recommendations to
ensure safe operation of Delayed Coker 21-10/5К |
|
2010 |
139 |
SGS NA |
Packaged
single-shaft combined cycle power units STAG 109FA |
General
Electric International, Inc. |
2010 |
140 |
SPE Rigco, Inc. |
Truck-mounted
units for chemicals preparation and injection into wells Type 4300-0021 |
SPE Rigco, Inc. |
2010 |
141 |
ООО PO KINEF |
Evaluate
possible extension of overhaul cycle (4 years) and develop recommendations to
ensure safe operation of units: АТ-1, АТ-6,
АVТ-2,
АVТ-6,
ELOU-2, 19/6, 19/10, L-35-11/300, L-35-11/600, LCh-35-11/1000, L-24/6,
LG-24/7, LCh-24/9, LG-35-8-/300 B, L-35-11/600, О
& P-Xylenes, Mixed Xylenes, GFU, Liquefied Gas Storage & Supply
Facility, Parex-1, Parex-2, Sulphur Recovery Unit, Carbonization Unit, Inert
Gas Unit |
|
2010 |
142 |
ОАО Slavneft-YaNOS |
Evaluate
possible extension of overhaul cycle (3 years) and develop recommendations to
ensure safe operation of units: АVТ-3
& 4, VТ-6,
1А-1М,
25/7, MTBE and ELOU-1 |
|
2010 |
143 |
SGS NA |
Incinerators
for ОАО Taneco |
Zeeco, Inc. |
2010 |
144 |
Toyo
Engineering Korea Ltd |
Ethylbenzene
Unit for ZAO Sibur Chimprom, Perm |
Toyo
Engineering Korea Ltd |
2010 |
145 |
KMT
International, Inc., |
Mobile
system for oil vessels and reservoirs cleaning and sludge processing MegaMACS |
KMT
International, Inc., |
2010 |
146 |
SGS NA |
Compressor
units (3 units) for ОАО
Acron, Velikiy
Novgorod |
GE
Oil & Gas, Inc. |
2010 |
147 |
HEURTEY
PETROCHEM |
Tubular
Reforming Furnace Н0001
for ОАО
Taneco, Nizhnekamsk |
HEURTEY
PETROCHEM |
2010 |
148 |
ОАО Slavneft-YaNOS |
Technical
examination (including use of acoustic emission method) and industrial safety
expert review, technical inspection |
|
2010 |
149 |
UOP
LLC |
CCR
Unit incorporated into Platforming Unit for ОАО Taneco, Nizhnekamsk |
Ilsung Corporation, |
2011 |
150 |
Petreco International Limited |
Waste
water treatment plant for ОАО
Moscow Refinery |
Petreco
International Limited |
2011 |
151 |
UOP
LLC |
CCR
Unit for ООО
Tobolsk-Polymer |
Ilsung Corporation, |
2011 |
152 |
ОАО Slavneft-YaNOS |
Evaluate
possible extension of overhaul cycle (3 years) and develop recommendations to
ensure safe operation of units: VТ-3, LG-35/11, L-35/11,
L-35/6, L-24/6, LCh-24/7 and KR-600 |
|
2011 |
153 |
ZAO Sibur Chimprom |
Industrial
safety expert review of pressure vessels, pipelines, pumps, fans, compressors;
technical inspections of vessels, inspection of pipelines |
|
2011 |
154 |
ОАО Moscow Refinery |
Industrial
safety expert review of buildings and structures |
|
2011 |
155 |
OOO
KINEF |
Evaluate
possible extension of overhaul cycle (4 years) and develop recommendations to
ensure safe operation of Process Units LCh-35-11/1000, L-24/6, LG-24/7,
LCh-24/9, LG-35-8/300 B, LCh-35-11/600, О & P-Xylenes, Mixed Xylenes,
GFU, Liquefied Gas Storage & Supply Facility, Parex1, Parex-2, Sulphur
Recovery Unit, Carbonization Unit, Inert Gas Unit |
|
2011 |
156 |
ОАО
Slavneft-YaNOS |
Approval
of nozzle weld-in arrangement, approval of repair procedure, approval of
change of the operating parameters Vessels,
units, process pipelines and process heaters of the Hydrocracker, Units
L-35/6 and AVT-3, Bitumen Unit |
|
2011 |
157 |
ОАО Saratov Refinery |
Technical
examination (including use of acoustic emission method) and industrial safety
expert review, technical inspection Vessels,
units, process pipelines and process heaters of the Process Units
L-35/11-300, L-35/11-600, AVT-6 |
|
2011 |
158 |
HEURTEY
PETROCHEM |
Heater
H-1801 for Vacuum Unit, OAO Khabarovsk Refinery |
HEURTEY
PETROCHEM |
2012 |
159 |
MARCON Ingenieurgesellschaft
mbH |
On-spot Loading Unit for
ZAO RNPK, Ryazan |
MARCON Ingenieurgesellschaft mbH |
2012 |
160 |
MARCON Ingenieurgesellschaft mbH |
Automated CAV loading station to fill clear
petroleum products into tank-cars for OAO Saratov Refinery, Saratov |
MARCON Ingenieurgesellschaft mbH |
2012 |
161 |
OOO Generation NKhO |
Reactor
R101C for OAO Ufaneftekhim |
Exterran Benelli Energy
C.P.E |
2012 |
162 |
TapcoEnpro International |
Refractory
coated slide valves with electro-hydraulic actuators and power control
systems for catalyst lines of Catalytic Cracking Unit for OAO Syzran Refinery |
TapcoEnpro International |
2012 |
163 |
Toyo Engineering Korea Limited |
Reactor
DC5201 with Agitator GD5201, Preheater EA5301, Devolatilizers FA5301/FA5302
for OAO Nizhnekamskneftekhim |
Mitsui Engineering &
Shipbuilding Co. Ltd. |
2012 |
164 |
OOO Heurtey Petrochem Rus |
Reactor Heater P-201 for OAO Moscow Refinery |
HEURTEY
PETROCHEM S.A. |
2012 |
165 |
OOO SIB |
Columns C-7501, C-7502, C-7503, C-7504, C-7505, C-7506 for OAO Khabarovsk
Refinery |
Zhangjiagang
Chemical Machinery Co., Ltd. |
2012 |
166 |
OOO Heurtey Petrochem Rus |
Heaters H-301 and H-302 of the Hydrotreating Section for OAO
Novokuibyshev Refinery |
HEURTEY
PETROCHEM S.A. |
2012 |
167 |
ОАО Slavneft-YaNOS |
Evaluate possible extension of overhaul cycle (3 years) and develop
recommendations to ensure safe operation of Process Plant KM-2 and Process
Units GFU-1 and UOSG |
|
2012 |
168 |
ОАО Slavneft-YaNOS |
Evaluate possible extension of overhaul cycle (3 years) and develop
recommen-dations to ensure safe operation of units: VТ-3, LG-35/11, L-35/11,
L-35/6, L-24/6, LCh-24/7 and KR-600 |
|
2012 |
169 |
ZAO GIAP-DISTcenter |
Technical examination (including use of acoustic emission method) and
industrial safety expert review, technical inspection of vessels, units,
process pipelines and process heaters of the Process Unit AT-6 and Catalytic
Cracker at ZAO Ryazan Refinery |
|
2012 |
170 |
ОАО Saratov Refinery |
Technical examination (including use of acoustic emission method) and
industrial safety expert review, technical inspection of vessels, units,
process pipelines at the Process Units L-35/11-300, L-35/11-600, AVT-6 |
|
2012 |
171 |
OAO Gazpromneft-Omsk
Refinery |
Technical examination of vessels, units and process pipelines at the
Hydrogen Production Unit |
|
2012 |
172 |
ZAO Sibur Chimprom |
Industrial safety expert review of pressure vessels, pipelines, pumps,
fans, com-pressors; technical inspections of vessels, inspection of pipelines |
|
2012 |
173 |
OOO Gazprom
Neftekhim Salavat |
Recommendations on
materials of construction for equipment and pipelines: |
|
2012 |
174 |
OAO Slavneft-YaNOS |
Approval of nozzle weld-in arrangement, approval of repair procedure,
approval of changing the operating parameters |
|
2012 |
175 |
ZAO
Johnsons Controls |
Screw compressor units for OAO Uralorgsyntez |
ZAO
Johnsons Controls |
2013 |
176 |
OOO Heurtey Petrochem Rus |
Heaters H-401, H-402, H-403, H-404 and H-405 of the Hydrotreating
Section for OAO Novokuibyshev Refinery |
HEURTEY PETROCHEM S.A. |
2013 |
177 |
RUSTEK
SA |
Polymer Surge Drum 52-V-1001 and Additive Stripper Bottom Separator
52-V-3601 for OAO LUKOIL Nizhegorodnefteorgsyntez |
Sices
SpA |
2013 |
178 |
SGS NA |
Mechanical Induced Gas Flotation Units MIGF SS-50 for ZAO Antipinsk
Refinery |
Separation
Specialists, Inc. |
2013 |
179 |
RUSTEK SA |
Heat exchangers for OAO Kuibyshev Refinery |
Sices
SpA |
2013 |
180 |
SGS NA |
Distributors Optimix Type ER and MP for OAO Syzran Refinery |
UOP
Limited |
2013 |
181 |
OAO ANK Bashneft - Bashneft Novoil |
Industrial safety expert review of vessels and units (including those
handling hydrogen gas), and waste-heat boilers at Bashneft Novoil facilities |
|
2013 |
182 |
OAO ANK Bashneft - Bashneft Ufaneftekhim |
Technical examination and industrial safety expert review of columns,
drums and heat-exchangers at Bashneft Ufaneftekhim facilities |
|
2013 |
183 |
OAO ANK Bashneft - Bashneft Ufa Refinery |
Approval of materials of construction, development of welding procedure
specifications, examination of equipment condition, recommendations on
heat-treatment, corrosion protection, prevention of corrosion cracking,
performing hydraulic, thermal and
strength calculations related to selection (replacement) of materials,
performing design work related to replacement of materials for the purpose of
manufacture, upgrade and retrofit of the refining equipment at Catalytic
Cracker gasoline hydrotreater. |
|
2013 |
184 |
OAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines and process heaters of
Process Units: |
|
2013 |
185 |
OOO LUKOIL-Perm-neftegas-pererabotka |
Technical examination and industrial safety expert review of vessels,
process pipelines, safety relief valves, rotary equipment, lifting equipment,
buildings and structures |
|
2013 |
186 |
ZAO Uralorgsyntez |
Industrial safety expert evaluation and technical inspection of process
equipment |
|
2013 |
187 |
OAO Sibur PETF |
Industrial safety expert evaluation of EG Plant process pipelines |
|
2013 |
188 |
OOO PO
Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2013 |
189 |
OOO INTERUNIS |
Technical examination and industrial safety expert review, technical
inspection, prepare technical passports of the equipment affected by accident
- vessels, units and process pipelinea of Unit LK-6U (Sections C-100, C-200
and C-300) at OAO Achinsk Refinery VNK |
|
2014 |
190 |
OAO Slavneft-YaNOS |
Technical examination (including use of acoustic emission method) and
industrial safety expert review, technical inspection of vessels, units,
process pipelines of the Process Unit: Hydrocracker, LCh-24/7 |
|
2014 |
191 |
OAO Slavneft-YaNOS |
Technical examination and industrial safety expert review of vessels,
units, process pipelines and process heaters of Process Units: AVT-4, KM-2,
1A-1M, KM-2 (C-200, C-300, C-400) |
|
2014 |
192 |
OAO ANK Bashneft - Bashneft Novoil |
Investigation of reasons for failure of reciprocating compressor M-1
DAON-550P, serial No. 73, Unit 39/4 of the Oil Plant |
|
2014 |
193 |
OAO ANK Bashneft - Bashneft Ufa Refinery |
Industrial safety expert review and assignment of safe operating life
of equipment at the process facilities of Bashneft Ufa Refinery |
|
2014 |
194 |
OAO ANK Bashneft - Bashneft Ufaneftekhim |
Industrial safety expert review of Visbreaker Heaters P-1,2,3 and Stack
of Heater P-1 |
|
2014 |
195 |
OAO ANK Bashneft - Bashneft Ufaneftekhim |
Industrial safety expert review and preparing a repair flow-chart for
Column K-2 of Diesel Hydrotreater L-24-7 |
|
2014 |
196 |
ZAO CTK-EURO |
Certification of conformity to TR CU 010/2011 for bellows-type expansion
joint FCC-UMA for FCC Unit of OAO Uralorgsyntez |
Idrosapiens
SRL |
2014 |
197 |
OOO PO Kirishinefteorgsyntez |
Certifiaction of conformity to TR CU 010/2011 and TR CU 032/2013 for
the equipment incorporated into Section No. 13 of the Oil Sludge and
Sediments Dewatering and Thermal Treatment Unit at OOO PO
Kirishinefteorgsyntez |
|
2014 |
198 |
ZAO CTK-EURO |
Certification of conformity to TR CU 010/2011 for spent catalyst
single-disc slide valve with electric actuator "Limitorque” for OAO Uralorgsyntez |
TapcoEnpro International |
2014 |
199 |
ZAO CTK-EURO |
Certification of conformity to TR CU 010/2011 for refractory-lined
slide valves (3 items) for FCC Unit of OAO Slavneft-YaNOS |
TapcoEnpro International |
2014 |
200 |
OOO MegaStroy |
Certification of conformity to TR CU 032/2013 for process pipelines DN
100 through 1200 mm |
|
2014 |
201 |
UOP LLC |
Certification of conformity to TR CU 010/2011, TR CU 004/2011 for the
equipment incorporated to CycleMaxTM CCRTM Regeneration Unit with Chlorosorb
Section for OOO RN-Tuapse Refinery |
UOP LLC |
2015 |
202 |
AO Ryazan Refining Company |
Industrial safety expert review of Isomerization Unit process heaters |
|
2015 |
203 |
OAO ANK Bashneft - Bashneft Ufaneftekhim |
Inspection, preparing detail design documentation for repair, acoustic
emission test of Hydrocracker Reactor R-101B |
|
2015 |
204 |
OAO ANK Bashneft - Bashneft Ufa Refinery |
Industrial safety expert review and assignment of safe operating life
of equipment |
|
2015 |
205 |
OOO NIPI ONGM |
Industrial safety expert review of detail design documentation
“Retrofitting flare KO drum site with use of Complex Diagnostic Monitoring
System (CDMS)” for the hazardous industrial facility “Central Gathering
Facility” operated by ZAO Vankorneft |
|
2015 |
206 |
OOO Heurtey Petrochem Rus |
Industrial safety expert review of Primary Reformer Heater H-201 for
OAO Akron |
HEURTEY
PETROCHEM S.A |
2015 |
207 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation “Replacing
pumps N-49 & N-69 of Pump Area - Section 73/3” and ”Replacing pump unit
N-262 of Pump Area – Section 1121/1” |
|
2015 |
208 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation
“Replacement of shell plates of electric precipitator 12-А-105, and
replacement of heat-tracing and insulation” |
|
2015 |
209 |
OOO Heurtey Petrochem Rus |
Industrial safety expert review of Electrical Desalter ED-101 and
ED-102 for OAO Gazpromheft - Omsk Refinery |
PROSERNAT |
2015 |
210 |
OOO Elistec Engineering |
Industrial safety expert review of detail design documentation for
revamping Reactor R-201 Section 200 Plant KT-1/1 of OAO Gazpromheft - Omsk
Refinery |
|
2015 |
211 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing actuators at Units UTN-1 and UTN-2 of Section No 11 |
|
2015 |
212 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
relocating flow meters at Unit AVT-3 of Section No 1 |
|
2015 |
213 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing n-butane pipeline from GFU outlet valve to SRKh inlet valve at Area
No 2 Section No 11 |
|
2015 |
214 |
OOO Tekhnoneftegas |
Industrial safety expert review of Gas Pressure Regulators Series
TA-900, ТА-600, TA-200, ТА-700, ТА-100, TA-99, TA TPR, TA-PR; Safety Shutoff
Valves Series ТА-900; Pressure Relieve Valves Series TA-SBV; Ball Valves
Series FDR-1, GDR-1, 2 for refining, petrochemical and chemical industries |
ООО Tormene AG RUS |
2015 |
215 |
AO RANZHEM |
Industrial safety expert review of detail design documentation for
manufacturing convection and radiant coils of flue gas preheater PVG-1200 for
Weak Nitric Acid Unit AK-72 of OAO Akron |
|
2015 |
216 |
AO RANZHEM |
Industrial safety expert review of detail design documentation for
retrofitting flue gas preheater PVG-1200 for Weak Nitric Acid Unit AK-72 of AO
OKhC Uralkhim |
|
2015 |
217 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
providing instruments to drums E-15 ÷ E-19 of Unit 19/5 Section No 1 |
|
2015 |
218 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
loading FCC heavy gas oil at the railroad rack of Unit 19/5 |
|
2015 |
219 |
OOO INTERUNIS |
Industrial safety expert review of detail design documentation for the
Complex Diagnostic Monitoring System for Columns Т-5601 and Т-5602 of Section
No 2 at OOO Stavrolen |
|
2015 |
220 |
RUSTEK SA |
Industrial safety expert review of equipment incorporated into
Formaldehyde Plant for OAO Metafrax |
Johnson
Matthey Formox АВ |
2015 |
221 |
OAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines of the Hydrocracker |
|
2015 |
222 |
OOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2015 |
223 |
ZAO
GIAP-DISTcenter |
Technical examination and industrial safety expert review of vessels
and units of Unit PV at AO Kuibyshev Refinery |
|
2015 |
224 |
OAO AK VNZM |
Certification of conformity to TR CU 032/2013 for pipelines of SRU 5-th
additional process line at OAO ANK Bashneft - Bashneft Ufaneftekhim |
|
2015 |
225 |
ZAO CTK-EURO |
Issue of the Technical Passport, preparing the Justification of Safety,
certification of conformity to TR CU 032/2013 for the bellows-type expansion
joint for OAO Uralorgsyntez |
Idrosapiens
SRL |
2015 |
226 |
ZAO CTK-EURO |
Issue of the Technical Passport, preparing the Justification of Safety,
certification of conformity to TR CU 010/2011 for spent catalyst single-disc
slide valve with electric actuator "Limitorque” for OAO Uralorgsyntez |
TapcoEnpro
International |
2015 |
227 |
SGS NA |
Preparing the Justification of Safety, certification of conformity to
TR CU 010/2011, TR CU 032/2013, TR CU 012/2011 for equipment to be operated
at Kazan TEC-3 of OAO TGK-16 |
Lectodryer
LLC |
2015 |
228 |
MAN Diesel & Turbo SE |
Issue of Technical Passports, preparing the Justification of Safety,
certification of conformity to TR CU 032/2013 for the FCC Unit equipment at
OAO Gazpromneftekhim Salavat |
MAN Diesel & Turbo SE |
2015 |
229 |
EQS |
Issue of the Technical Passport, preparing the Justification of Safety,
certification of conformity to TR CU 032/2013 and TR CU 010/2011 for the
aceptic tank (drum) |
INACEINOX |
2015 |
230 |
VZAO Chimmashexport |
Preparing the Justification of Safety, certification of conformity to
TR CU 010/2011 for equipment incorporated into Veba Combi Cracking (VCC) Unit
of OAO TAIF-NK |
TEC |
2015 |
231 |
OAO AK VNZM |
Ppreparing the Justification of Safety, certification of conformity to
TR CU 032/2013 for process pipelines of Unit 1-A/1M at OAO ANK Bashneft -
Bashneft Ufaneftekhim |
|
2015 |
232 |
AO Aliter-Axi |
Industrial safety expert review of detail design documentation for
replacing rizers of external cyclones E-201/1, 2, 3, 4 at Unit G-43-107 of AO
Gazpromneft-Moscow Refinery |
|
2016 |
233 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing heat-exchanger T-45/1 at Unit АВТ-1 Section No 1 |
|
2016 |
234 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing pump H-43 at Unit АВТ-2 Section No 1 |
|
2016 |
235 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
retrofitting DCS and ESD system of UNIT AVT-4 |
|
2016 |
236 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
retrofitting DCS and ESD system of UNIT L-24/6 Section No 3 |
|
2016 |
237 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
switching Reformer Stabilization System of Unit LG-35-8/300B Section No 3 to
a single-column arrangement |
|
2016 |
238 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing drum E-2003 at Unit PV Section No 2 |
|
2016 |
239 |
OOO INTERUNIS |
Industrial safety expert review of detail design documentation for
upgrading the Complex Diagnostic Monitoring System (CDMS) of isothermal
storage tank E-3 at EO&G Plant of AO Sibur-Neftekhim |
|
2016 |
240 |
RUSTEK SA |
Industrial safety expert review of equipment incorporated into
Formaldehyde Plant for OOO Metadinea |
|
2016 |
241 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing circulation compressor 02-CC-1 Model 6RSA 36 with compressor TK-601
Model 4RSA 36В at Unit Isomalk-2 (NTI) Section No 3 |
|
2016 |
242 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for work
arrangement to dismantle idle equipment and structures at Unit MXO Section No
20 |
|
2016 |
243 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
switching control functions of Gas Fractionation Unit with Dry Gas Sweetening
Unit to electronic DCS and ESD system |
|
2016 |
244 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing heat exchanger KX-8/1 at GFU Section No 2 |
|
2016 |
245 |
OAO Slavneft-YaNOS |
Technical examination,
industrial safety expert review and technical inspection of vessels, units,
process pipelines of Process Units: Hydrocracker, KM-2, GNE, YNSSS, TsVK-1,
UKFG, VT-6 |
|
2016 |
246 |
ОOOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2016 |
247 |
AO Ryazan Refining Company |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines of Unit L-35-11/300 |
|
2016 |
248 |
AO RANZHEM |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 for coils of flue gas pre-heater PVG-1200 for the process line
of Weak Nitric Acid Unit AK-72 of AO OKhC Uralkhim |
|
2016 |
249 |
AO Giprogazoochistka |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013, TR CU 010/2011 for 4-way valves for SRU of PAO ANK Bashneft -
Bashneft Ufa Refinery |
Valco
Armaturen GmbH |
2016 |
250 |
AO Giprogazoochistka |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 for catalytic reactors K-501 and K-502 for SRU of PAO ANK
Bashneft - Bashneft Ufa Refinery |
MARTIN BUSCH & SOHN |
2016 |
251 |
ZAO CTK-EURO |
Issue of Technical Passports, preparing the Justification of Safety,
certification of conformity to TR CU 032/2013, TR CU 010/2011, TR CU
012/2011, TR CU 004/2011, TR CU 020/2011 for equipment incorporated into
Bitumen Cooling & Bagging Unit for OAO TAIF-NK |
UNID Technologies GmbH |
2016 |
252 |
AO Ryazan Refining Company |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 for flare KO drum |
OOO Gazoneftekhimcomplekt |
2016 |
253 |
VZAO Chimmashexport |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 and TR CU 010/2011 for vessels incorporated into compressor
units for Mozyr Refinery (Belarus) |
S.C. UZUC S.A. |
2016 |
254 |
VZAO Chimmashexport |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 and TR CU 010/2011 for vessels for FGP-WPMP TengizChevroil |
S.C. UZUC S.A. |
2016 |
255 |
VZAO Chimmashexport |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 and TR CU 010/2011 for vessels for AO Gazpromneft-Moscow
Refinery |
S.C. UZUC S.A. |
2016 |
256 |
UOP LLC |
Performing GOST Strength Calculations, Issue of Technical Passports,
preparing the Justification of Safety, certification of conformity to TR CU
010/2011, TR CU 032/2013, TR CU 012/2011 for the equipment incorporated into
modular CycleMaxTM CCRTM Regeneration Unit for AO
Gazpromneft-Moscow Refinery |
UOP LLC |
2016 |
257 |
SGS NA |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013, TR CU 010/2011 for cooling air control valves for
Nizhnevartovsk Heat and Power Plant |
NorthEast
Controls, Inc. |
2017 |
258 |
ZAO CTK-EURO |
Issue of the Technical Passport, preparing the Justification of Safety,
certification of conformity to TR CU 032/2013 for the bellows-type expansion
joint for Unit GK-3 of AO Angarsk Petrochemical Company |
Idrosapiens
SRL |
2017 |
259 |
OOO PO
Kirishinefteorgsyntez |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013 for process pipelines
for OOO PO Kirishinefteorgsyntez |
|
2017 |
260 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing safety relief valves with ones provided with switching gears, and
piping valve with manually operated valves to ensure safe and fail-free
operation under conditions of extended overhaul cycle for Unit LG-35-8/300B
Section No 3 |
|
2017 |
261 |
OOO PROKAMI |
Industrial safety expert review of detail design documentation
including technology to dry propane while being loaded to tank containers at
facility 941-15/1 - System to load liquefied gases to truck tanks at OOO
KINEF |
|
2017 |
262 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing existing pumps CN-11, CN-12, CN-13 provided to Stripper K-101a at
Unit L-24/600 |
|
2017 |
263 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
replacing Deaerator DE-1 at SKU Section No 2 |
|
2017 |
264 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
installing Diesel pipeline sections |
|
2017 |
265 |
OOO ETIREX |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Railroad Lube Loading Rack Unit 207.
Electrical tracing of pipelines” at OAO Slavneft-YaNOS |
|
2017 |
266 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Arrangements for additional
superheated steam generation at UPVSK Section No 2” |
|
2017 |
267 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Provision of shut-off valves on
discharge side of pumps N-1/1,2,3 at FCC Unit Section No 2” |
|
2017 |
268 |
OAO VNIPIneft |
Industrial safety expert review of checking calculation of heaters
ON-1000/1,2 of VGO Hydrotreater Section No 2 of AO Ryazan Refining Company |
|
2017 |
269 |
AO Construction Company PROFILE |
Industrial safety expert review of Diesel storage tanks RGC-50 m3
and RGC-100 m3 to be operated at PAO NPO Saturn |
|
2017 |
270 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing pumps N-44 and N-44A at
Unit AVT-1 Section No 1” |
|
2017 |
271 |
AO Construction Company PROFILE |
Industrial safety expert review of storage tanks CBKM 0002562, CBKM
0002563, CBKM 0002564, CBKM 0002565, CBKM 0002566, CBKM 0002556, CBKM 0002557
located at PAO ODK-Saturn within the Ship Gas-Turbine Unit Production &
Testing Plant at PAO NPO-Saturn. |
|
2017 |
272 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Provision of floating suction
devices in Diesel storage tanks R-46 and R-47 at the tank farm (Unit 910-02)”
at OOO RN-Tuapse Refinery |
|
2017 |
273 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Ensuring conformity of Heaters P-1
and P-101 at Unit L-35-5/300 Section No 3 to industrial safety rules” |
|
2017 |
274 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Temporary shutdown of idle equipment
of the heat recovery system at Unit ELOU-AVT-1 Section No 1” |
|
2017 |
275 |
OAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines of Process Units: GFU, UPV,
UPS |
|
2017 |
276 |
OOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2017 |
277 |
ZAO GIAP-DISTcenter |
Technical examination, industrial safety expert review and inspection
of process pipelines of Units: PV, UKSNG at AO Kuibyshev Refinery |
|
2017 |
278 |
ZAO GIAP-DISTcenter |
Technical examination and industrial safety expert review of vessels
and units of Unit VT-4 at AO Ryazan Refining Company |
|
2017 |
279 |
AO Ryazan Refining Company |
Technical examination and industrial safety expert review of vessels
and units of Process Units: 19/5, TK-1, ELOU-AVT-1 |
|
2018 |
280 |
AO Ryazan Refining Company |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2018 |
281 |
OOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2018 |
282 |
OAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines of Unit ELOU-AT-4 |
|
2018 |
283 |
Gamma Tech FZE |
Examination of Process Heaters 200Н-1, 200Н-2, 300Н-1/2/3/4 at CCR Unit
of Turkmenbashi Refinery (Turkmenistan) |
|
2018 |
284 |
OOO IK SIBINTEK |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing threaded thermowells with
flanged thermowells, and replacing orifice flowmeters to other type
(ultrasonic meters, vortex-type meters) at OOO Novokuibyshev Oil and Additive
Plant |
|
2018 |
285 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing pumps N-1A, N-2 and N-2B
at heat network area of Section No12” |
|
2018 |
286 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing J-bend at FCC Unit Section
No 2” |
|
2018 |
287 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Modification of piping arrangement
for cooler X-9” |
|
2018 |
288 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamping UNIT COM Section No 23.
Reducing power consumption by modification of outgoing extract flow
arrangement” at OOO Novokuibyshev Oil and Additive Plant |
|
2018 |
289 |
PAO Samaraneftekhimproject |
Industrial safety expert
review of detail design documentation for revamping hazardous industrial
facility “Revision of detail design documentation “Upgrading gas-supply
facilities. HTOHTF Boiler House” at OOO Novokuibyshev Oil and Additive Plant |
|
2018 |
290 |
ОАО Novokuibyshev Refinery |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Section No 10, Product &
Feedstock Supply Facility. Replacing storage tank RVS-8 with integration into
existing utilities and process arrangement” at AO Novokuibyshev Refinery |
|
2018 |
291 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing main steam pipeline PK-4
at heat network area of Section No12” |
|
2018 |
292 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Upgrading protection systems using
chemical technology for Unit ELOU-AVT-4 Section No 1” |
|
2018 |
293 |
ОАО Novokuibyshev Refinery |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Tie-in of Diesel pump-out pipeline
from AO Novokuibyshev Refinery to LPDS Voskresenka to the newly designed
pipeline for gasoline pump-out from AO Novokuibyshev Refinery to LPDS
Voskresenka for alternate pumping-out. Area 1 Section No 59 at AO
Novokuibyshev Refinery. |
|
2018 |
294 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Modification of process flow design
arrangements for facilities of Section No 11” |
|
2018 |
295 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp of facilities at OOO NOAP.
Installation of instrument to measure wind velocity and detect wind direction”
at OOO Novokuibyshev Oil and Additive Plant |
|
2018 |
296 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp of Section No 28” at OOO
Novokuibyshev Oil and Additive Plant |
|
2018 |
297 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp of Unit VT Section No 23.
Mixing Unit for vacuum residues from Units AVT-8, 9, 11 and vacuum residue
from Unit VT” at OOO Novokuibyshev Oil and Additive Plant |
|
2018 |
298 |
PAO Samaraneftekhimproject |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Ensuring conformity of buildings and
rooms of Section No 39 to fire safety regulations and rules” at OOO Novokuibyshev
Oil and Additive Plant |
|
2018 |
299 |
ZAO CTK-EURO |
Issue of Technical Passports, preparing the Justification of Safety,
certification of conformity to TR CU 010/2011, TR CU 032/2013, TR CU
012/2011, TR CU 020/2011 for top unheading devices, bottom unheading devices
and central feed devices with hydraulic power units for coke drums of Decayed
Coker Unit UZK-2000 (Section 100) at PAO ANK Bashneft - Bashneft Ufa Refinery |
DeltaValve,
LLC |
2018 |
300 |
SGS NA |
Preparing the Justification of Safety, certification of conformity to
TR CU 010/2011, TR CU 032/2013 for choke manifold assembly Model 200M to be
operated at Orlan Planform (Sakhalin 1 Project) |
Worldwide
Oilfield Machine Inc. |
2019 |
301 |
VZAO Chimmashexport |
Preparing the Justification of Safety, certification of conformity to
TR CU 032/2013, TR CU 010/2011 for vessels incorporated into compressor units
for Yaya Refinery (AO NefteChimService) |
S.C.
UZUC S.A. |
2019 |
302 |
UOP LTD |
Performing GOST Strength Calculations, Issue of Technical Passports,
preparing the Justification of Safety, certification of conformity to TR CU
010/2011, TR CU 032/2013, TR CU 012/2011 for the equipment incorporated into
modular CCRTM Regeneration Unit and Platforming Reactor for Yaya
Refinery (AO NefteChimService) |
ILSUNG HISCO LTD. |
2019 |
303 |
AO Ryazan Refining Company |
Technical examination and industrial safety expert review of vessels,
units and process pipelines of Process Units: 19/5, TK-1, ELOU-AVT-3 |
|
2019 |
304 |
OOO PO Kirishinefteorgsyntez
|
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2019 |
305 |
OAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines and process heaters of
Process Units: VT-6, L-35/6, Bitumen Unit, Isomalk-2, UPV, AVT-3, VT-3,
KR-600, Hydrocracker |
|
2019 |
306 |
UOP LLC |
Issue of Technical Passports, preparing the Justification of Safety,
certification of conformity to TR CU 010/2011, TR CU 032/2013 for the pipelines
incorporated into modular CycleMaxTM CCRTM Regeneration
Unit for AO Gazpromneft-Moscow Refinery |
UOP LLC |
2019 |
307 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp of process pipelines of
Section No 1 and integration of vacuum /atmospheric residue station of Unit
AT-6” |
|
2019 |
308 |
AO RANZHEM |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacement of refractory lining of
Heater PVG-1200/2 Section No 15” at KAO Azot |
|
2019 |
309 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing pump N-12 at ASSB of Area
No 3 Section No 11” |
|
2019 |
310 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp. Installation of pipeline
sections to integrate the LPG / SRF tank farm of Area No 2 and tank farm Unit
527/1,2 of Area No 7 to the new flare header of Section No 11 |
|
2019 |
311 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Ensuring conformity of pilot burners
on Heaters P-1 and P-2 of Unit AVT-3 Section No 1 to industrial safety rules” |
|
2019 |
312 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing steam traps of heat
exchangers T-1A, T-1B, T-2A, T-2B, T-2V at the water chemical treatment plant
Section No 12” |
|
2019 |
313 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Connecting the newly installed flame
detectors on main burners of heaters P-1 and P-2 to the control circuit
implemented on board instruments of the Visbreaker Section No 1” |
|
2019 |
314 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Replacing pump N-7007/7 at the water
chemical treatment plant Section No 12” |
|
2019 |
315 |
OOO Neftemashstroy |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Heater coil P-101 of Catalytic
Reformer LCh-35/11-1000 at AO Gazpromneft-Moscow Refinery |
|
2020 |
316 |
AO Ryazan Refining Company |
Industrial safety expert review of detail design documentation for
revamping hazardous industrial facility “Revamp. Replacing pump N-231,
replacing canned pump N-52 of gas compression unit Section No 2” |
|
2020 |
317 |
AO Ryazan Refining Company |
Technical examination (partial and full) and industrial safety expert
review of steel welded storage tanks |
|
2020 |
318 |
PAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines and process heaters of
Process Units: VT-3, AVT-4, Bitumen Unit, 1A-1M, 25/7, GFU, GOBKK, L-24/6,
L-35/11, MTBE, SRU |
|
2020 |
319 |
PAO Slavneft-YaNOS |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2020 -2022 |
320 |
OOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2020 |
321 |
PAO Slavneft-YaNOS |
Technical examination, industrial safety expert review and technical
inspection of vessels, units, process pipelines and process heaters of
Process Units: Bitumen Unit, ELOU-AT-4, L-35/11, UPSK, SRU, YOSG,
Hydrocracker, UPV, UPV-2, GODT, LCh-24/7, KM-2 (Sections C-100, C-200, C-300,
C-400 and C-500), CVK-1,2,3, Nitrogen Station, SNN |
|
2021 |
322 |
OOO PO Kirishinefteorgsyntez |
Technical examination and industrial safety expert review of steel
welded storage tanks |
|
2021 |